Our thoughts are with all of you at ||
来源:  作者:  编辑:Wang Wenxue  日期:2024-05-24  Click rate:3623  [I want to print]  [关闭]
摘要:

引题:

Key words:


Dear teacher, thank you very much for taking the time to accept this interview。I believe that through this interview, students will have a better understanding of the Office, and then better cooperate with and help the work of the Office。Let's cut to the chase and get down to business。

好。

I heard that the infrastructure Office used the May Day to replace the stadium and basketball court damaged lights, can you give us a detailed introduction?

Due to the aging of the school's original street lamps, insufficient brightness, trees and other problems, and with the increase of the school's infrastructure in recent years, the street lamp layout also needs to be followed up in time。In response to this problem, we have carried out a comprehensive rectification during the May Day holiday。In addition, for places with difficult operation such as football fields, cranes are used for auxiliary replacement。A total of 22 street lights were replaced, costing tens of thousands of yuan。Ensure the safety of teachers and students at night。Whenever night falls, the campus street lights show the warm light, the campus of your institute is brighter and more beautiful。



What does the daily work of the Infrastructure Services Office mainly consist of?

It is mainly the procurement of school infrastructure materials, the maintenance of teaching equipment and facilities, and the daily maintenance of security and monitoring。At the same time, the maintenance of basic living facilities in public areas, such as the daily maintenance of sports fields, is one of our work。


Text | Xiao Jin

Photo | Li Lianchao

Editing by | Lianchao Li

Editor: | Li Lianchao

Proofreading | Yuan Yuting

Edited by | Fan Wei

E-mail:
作者:
编辑:Wang Wenxue
Previous post:Reach the peak forever, dream set sail || The "Top Ten Graduates" selection of Digital Media College of Guiyang Information Science and Technology University in 2024 was successfully concluded
Next post:The sixth "Tsing Ma Project" and the sixth Youth Cadre Youth School training excellent learning experience show
Address: No. 8, Siya Road, Huaxi University Town, GUI 'an New District, Guiyang, Guizhou
Taxpayer Identification Number: 52520000090327188H
Qian ICP for 20002667